BOILER LIFT: AUGHINISH ALUMINA
The boilers, each measuring over 14 metres long, were installed as a part of the modernisation and upgrade works currently being undertaken at the plant. Meticulous planning was involved in traversing them over the existing power lines and installing them in what was a very tight work site.